04 — Engineering Process

Six disciplines. One continuous chain.

A facade is only as strong as its weakest interface. KGS owns every stage from survey to handover — no handoffs, no gaps, no assumptions.

Single chain
One accountable team — design through handover.
Documented
Every interface, calculation and tolerance signed off.
Tested
Wind tunnel, mockup and on-site water testing.
Coordinated
BIM-coordinated with structural and MEP early.
The chain

From first survey to final handover.

Step 01 · Wk 1–2

Survey

Site assessment, structural review, environmental and wind-load context. Every constraint mapped before a single line is drawn.

Step 02 · Wk 2–5

Design

Architectural collaboration on system selection, sight-lines, transparency targets and the material strategy.

Step 03 · Wk 4–9

Engineering

BIM-coordinated shop drawings, thermal & structural calculations, mockup specification, performance modelling.

Step 04 · Wk 8–16

Fabrication

Italian-grade CNC fabrication of profiles, brackets and glazing units to ±0.5mm tolerance, barcoded for traceability.

Step 05 · Wk 14–20

Assembly

Unitised panel assembly under controlled factory conditions. 100% pre-installation quality audit before despatch.

Step 06 · Wk 18+

Installation

Trained crews execute on-site installation with weather-tight commissioning and structured handover support.

Deliverables

What you receive at every stage.

01
Survey
Wk 1–2
Site reportWind/seismic dataStructural compatibility
02
Design
Wk 2–5
Concept facade studySystem optionsMaterial samples
03
Engineering
Wk 4–9
Shop drawingsThermal reportMockup specification
04
Fabrication
Wk 8–16
CNC profilesBracketryQA traceability sheets
05
Assembly
Wk 14–20
Unitised panelsPre-install QAPacking & logistics
06
Installation
Wk 18+
On-site installWeather testingHandover documentation